PV-ESS-EV Charging Solution
Integrated PV + LFP battery storage + DC fast charging — pre-engineered, containerized, and deployed across 6 countries. One system, one partner, zero integration headaches.
300+
Projects Deployed
5+ GWh
Global Installed Base
8+ Years
R&D & System Engineering
24/7
Remote EMS Monitoring
Three Deployment Scenarios
From grid-connected urban charging stations to fully off-grid mining microgrids — the same core technology, configured for your site conditions and business model.
Grid-tied charging hub with PV + ESS to cut demand charges and boost charging revenue. No off-grid switching needed — lower system cost, higher stability.
For: C&I parks, commercial complexes, transport hubs, charging operators
See on-grid specs
For sites with unstable or no grid — PV + ESS + diesel generator integration with STS seamless switching. Powers heavy-duty EV trucks and on-site facilities.
For: Mining sites, oil fields, remote construction, emerging-market urban fringe
Talk to a microgrid engineer
PV, ESS, and EV chargers coupled at 750V DC bus — fewer conversion stages, higher system efficiency. EMS dynamically dispatches across all energy sources and loads.
For: Capital-intensive sites, high-power charging demands, no-grid-access locations
Explore DC couplingSystem Architecture
A closed-loop microgrid: solar generation → smart storage → EV charging dispatch — all orchestrated by a single EMS platform.
PV array generates — prioritizes direct EV charging for maximum self-consumption
Excess solar → stored in BESS container for peak shaving and night dispatch
EMS predicts load & PV output — automatically optimizes charge/discharge timing
BESS discharges to EV chargers — no solar input needed, grid supplements if required
Grid outage → BESS and STS take over in <20ms, or diesel generator auto-starts
DG + ESS SOC coordination — generator runs at peak efficiency, fuel cost cut ~40%
System Components
Pre-integrated, pre-tested, shipped in standard containers. Your site needs a concrete pad and a grid connection — we handle the rest.
K-eBank 241F · 261L · K-ePowerMini
60 – 720 kW · Dual-Gun · CCS2
Aluminum · Single-Post · 20+ Yr Life
AI-Powered · Real-Time · Remote
Revenue & Business Model
PV-ESS-EV isn't just infrastructure — it's a business. Each component generates its own return while the integrated system unlocks additional value.
DC fast charging fees per kWh. A 720kW station serving 100+ EVs/day generates predictable recurring revenue from day one.
Charge BESS from grid during off-peak (low rate), discharge during peak (high rate). AI scheduling maximizes spread automatically.
Each kWh of solar consumed on-site is a kWh not purchased from the grid. Storage shifts excess daytime generation to evening charging demand.
Green energy certification, carbon credit trading, demand response programs, and load optimization services add incremental revenue layers.
Typical ROI timeline: 3–5 years for on-grid commercial stations. Faster in markets with high peak/off-peak spreads.
Build Your Revenue ModelProject Cases
Six operational sites, three countries, one platform. From China's high-density urban hubs to Azerbaijan's remote microgrids and Malaysia's heavy-duty truck stations — running 24/7 under real grid conditions since 2022.
2160 kW / 36 guns
230 kWp
300kW / 645kWh
720 kW / 12 guns
50 kWp
375kW / 723kWh
1440 kW / 24 guns
98 kWp
250kW / 455kWh
120 kW / 4 guns
26 kWp
100kW / 233kWh
240 kW HDT / 4 guns
48 kWp
1000kW / 2410kWh
720 kW / 12 guns
116 kWp
200kW / 230kWh
Why KUNETIC
01 BESS, PCS, MPPT, STS, EMS, and fire protection in one enclosure. Factory-tested as a system — your team connects three cables and powers on.
02 Enclosure colors, branding, local connectors, regional compliance — we build to your market while you own the customer relationship.
03 AI-driven scheduling optimizes against real-time prices and EV demand. Sites see 15–25% higher revenue vs. static dispatch.
04 Three-level protection — pack → cabinet → system. Aerosol suppression, smoke sensing, graded isolation. IP54 rated.
Start Your Project
Send us your site details — location, available area, target EV volume, and local grid conditions. We'll return a preliminary system design with financial projections within 3 business days.
Or email eliza@lithiumaabatteries.com — we respond within 8 hours on business days.