SOLAR + BESS + DIESEL
Solar + Battery + Diesel Hybrid Microgrid System
Reliable hybrid power that combines solar PV, battery storage and diesel generation for remote sites, industrial facilities and off-grid applications.
WHY HYBRIDIZE DIESEL POWER?
A More Flexible Way to Run Diesel-Dependent Power
Diesel generators provide dependable power, but continuous operation can mean high fuel costs, maintenance demand and emissions. A hybrid system reduces diesel dependence without compromising supply reliability.
Reduce Generator Runtime
Solar generation and battery storage cover more of the daily load, so the generator runs only when it adds real value.
Peak & Motor Load Support
Fast battery response supports motor starts, load spikes and sudden demand changes without forcing the generator to chase every peak.
Increase Solar Utilization
Excess PV energy can be stored and dispatched later, increasing renewable contribution when the site needs it most.
Weak-Grid & Off-Grid Support
A coordinated microgrid keeps critical loads supplied where grid access is limited, unstable or completely unavailable.
SYSTEM ARCHITECTURE
How the Hybrid System Works
AC-Coupled Hybrid Microgrid Architecture
The EMS coordinates solar output, battery charging and diesel generator operation to maintain a stable AC bus under changing site conditions.
- Solar PV and PV inverter generate renewable electricity during daylight.
- BESS and PCS store surplus energy and deliver fast-response power.
- Diesel generation provides backup during low solar availability or high demand.
- Metering, CTs and EMS control each asset as one coordinated system.
- Grid and transformer interfaces can be included where a site requires support.

OPERATING MODES
Designed Around Real Site Conditions
One system can be configured around the operating reality of your site, from isolated diesel microgrids to grid-connected facilities with constrained transformer capacity.

Off-Grid Hybrid Operation
For remote sites without a reliable grid connection, solar PV and battery storage provide primary energy while the diesel generator supplies dependable backup when solar output or battery state of charge requires it.

Solar + BESS with Diesel Support
The EMS prioritizes renewable generation and stored energy, then starts or loads the generator only when site demand, weather conditions or reserve requirements call for it.

Grid / Transformer Power Support
At grid-connected sites, the BESS can support transformer capacity during peaks, reduce demand pressure and help maintain stable power for critical operations.
REFERENCE SYSTEM CONFIGURATIONS
Flexible System Configuration for Different Power Requirements
KUNETIC configures hybrid energy storage around the load profile, operating environment, generator interface and future expansion requirements of each project.
TYPICAL SYSTEM SCALES
Compare System Configurations
The architecture above can be scaled to suit different power demands. Compare two indicative configurations below.
| Engineering parameter | 220kW / 220kWhSmall industrial and remote sites | 400kW / 440kWhMedium commercial and industrial projects |
|---|---|---|
| Power & Storage | ||
| Rated AC Output | 220kW | 400kW |
| Battery Energy | 220kWh LFP | 440kWh LFP |
| PCS | 3 × 125kW | 6 × 125kW |
| System Integration | ||
| PV Integration | AC-coupled, project-specific | 100–400kW AC-coupled |
| Diesel Generator Interface | 100–300kVA | 200kVA–1MVA |
| Battery Charging Circuit | 40kW | 80kW |
| Equipment & Control | ||
| Cooling | Liquid cooling | Liquid cooling |
| Enclosure | IP55 / C4 | IP55 / C4 |
| Control & Expansion | Integrated EMS / parallel-ready | EMS-M / EMS-S / parallel-ready |
Small industrial and remote sites
Power & Storage
- Rated AC Output
- 220kW
- Battery Energy
- 220kWh LFP
- PCS
- 3 × 125kW
System Integration
- PV Integration
- AC-coupled, project-specific
- Diesel Generator Interface
- 100–300kVA
- Battery Charging Circuit
- 40kW
Equipment & Control
- Cooling
- Liquid cooling
- Enclosure
- IP55 / C4
- Control & Expansion
- Integrated EMS / parallel-ready
Medium commercial and industrial projects
Power & Storage
- Rated AC Output
- 400kW
- Battery Energy
- 440kWh LFP
- PCS
- 6 × 125kW
System Integration
- PV Integration
- 100–400kW AC-coupled
- Diesel Generator Interface
- 200kVA–1MVA
- Battery Charging Circuit
- 80kW
Equipment & Control
- Cooling
- Liquid cooling
- Enclosure
- IP55 / C4
- Control & Expansion
- EMS-M / EMS-S / parallel-ready
Reference configurations illustrate typical system scales. Final design is confirmed from project-specific engineering inputs.

EMS & DIESEL GENERATOR COORDINATION
Intelligent Control for Hybrid Power Optimization
The EMS coordinates solar, battery and generator output in real time to stabilize site power and reduce unnecessary diesel runtime.
Generator Power Control
Keep generators in a planned operating range while the BESS absorbs load swings.
Fast Load Support
Supply fast battery power for motor starts and demand peaks.
PV / Diesel Coordination
Prioritize solar and stored energy, with diesel backup when needed.
Reactive Power Support
Support site voltage and power-quality needs where specified.
Parallel System Control
Coordinate additional storage and generators as the site expands.
MINING & REMOTE SITES
Built for Diesel-Dependent & Remote Sites

Mining Operations
Reliable power for mines and processing sites with limited grid access, variable loads and high fuel exposure.

Construction Sites
Flexible temporary or semi-permanent power for demanding construction schedules and remote work areas.

Oilfield & Drilling
Stable electricity for continuous industrial operations where interruptions and fuel logistics carry a high cost.

Off-Grid Islands
Independent renewable hybrid power for isolated communities, resorts and critical island infrastructure.
SIZE YOUR HYBRID SYSTEM
A Hybrid System Built Around Your Site
Share your site location, current power setup, and approximate load. Estimates are enough to get started.
Request a System Design
FAQ
Hybrid System Questions
Can BESS work with my existing diesel generator?
In many projects, yes. Our engineering review checks generator capacity, controls, load profile and operating targets before defining the integration approach.
Can the system operate completely off-grid?
Yes. A correctly sized solar, BESS and generator hybrid microgrid can supply off-grid loads while maintaining generator backup for low-solar or high-demand periods.
How much diesel fuel can the hybrid system save?
Fuel reduction depends on solar resource, load profile, generator efficiency, operating schedule and battery sizing. We estimate it from your project data rather than applying a generic percentage.
How do I size the battery and PCS?
Sizing starts with your load profile, peak demand, motor starts, solar plan, generator details, autonomy requirement and site conditions.
PROJECT-BASED HYBRID POWER
Ready to Design Your Hybrid System?
Send your load profile, current generation assets and site requirements. We will help you define a practical solar, storage and diesel power strategy.