PROJECT DESIGN · NIGERIA
Solar EV Charging Station Design in Nigeria
This solar EV charging station design is for a site in Nigeria. It combines 100 kWp of solar PV, 241 kWh of battery storage and a 120 kW DC charging system. KUNETIC's proposed design uses an energy management system to control power flow across the site.
Charging operators can use this design to assess a similar station. The grid connection, vehicle demand and site space guide the choice of equipment. These details also set the limits on charging power.
A solar carport with storage and DC charging
The proposed station brings together solar panels, a battery cabinet, a power converter and separate charging terminals. A solar carport can hold the panels above the charging bays. The main electrical equipment sits in a separate service area.
The layout should put solar power to use when vehicles arrive. It must keep charging demand within the available supply and leave room for service access. A site survey and vehicle charging schedule help set the final layout.
Proposed system configuration
| Component | Reference configuration | Role in the station |
|---|---|---|
| Solar PV | 100 kWp | Generate power for charging and battery charging |
| Battery storage | 241 kWh LFP | Store energy for later use |
| Power conversion system (PCS) | 125 kW | Convert power between the battery and AC system |
| Solar charge control | 120 kW MPPT | Manage power from the PV array |
| DC charging equipment | 120 kW power cabinet with two terminals | Share charging power between connected vehicles |
| Energy management system (EMS) | Site controller and monitoring | Coordinate equipment operation |
These are proposed equipment ratings. The 241 kWh figure is nominal battery energy. Reserve settings and system losses reduce the energy that reaches the vehicles.
The PCS and MPPT perform different jobs. Adding their ratings does not give the station's output. The two terminals share one 120 kW power cabinet. They are not two separate 120 kW EV chargers.
Equipment price range and what affects it
For a solar EV charging equipment package of a similar scale, allow a reference budget of US$50,000–80,000, on an FOB Shenzhen equipment-supply basis. This is a planning estimate for a customized package, not a fixed price for the exact configuration shown or a maximum price for every project.
The reference scope covers solar PV modules, battery storage with PCS and MPPT, EMS, and split DC charging equipment. KUNETIC supplies equipment; this budget is not a turnkey installed-station price. The final quotation will state the equipment and accessories included.
Your requirements and site conditions affect the equipment selection and price:
- Available installation area, shading and the PV capacity that can fit on the site.
- Battery capacity, backup reserve and the hours of operation to support.
- Charging power, number of terminals and connector standards for your vehicles.
- Grid or transformer capacity, existing generators and integration requirements.
- Ambient heat, humidity, corrosion exposure and local electrical requirements.
- Equipment layout, cable distances, protection devices and monitoring options.
Carport structures, mounting works, foundations, site cabling, civil works, installation and commissioning services are excluded from this reference equipment budget. Freight, insurance, import duties, taxes and local grid upgrades are also excluded. Any additional supplied materials must be itemized in the quotation.
Actual prices depend on the agreed specifications, supply scope and quotation date. Larger systems or additional requirements may fall outside this range. Request a site-specific equipment quotation with your site plan, installation area and charging needs.
How solar, the battery and chargers connect
The PV array feeds the storage system through solar charge control. The PCS connects the battery to the site's AC system. The charging power cabinet takes AC power and supplies DC power to the charging terminals.
Meters and safety devices sit between the electrical circuits. The EMS tracks site supply, charging demand and battery state of charge. It uses this data to control power flow within the system's limits.
The split design places the terminals near the parking bays. The main power cabinet stays in the service area. Check cable routes, safe spacing and circuit protection for the chosen layout.
For the wider system options, see KUNETIC's PV-ESS-EV charging solutions.
Why include battery storage for EV charging?
Storage gives the operator more control over when to use solar energy. It can help cover a short power gap during a busy charging period. The battery and PCS must have enough capacity to meet that load.
Keeping energy in reserve for backup leaves less for daily charging. Set that reserve level in the operating plan. If backup is needed, name the loads that must keep running during a grid outage.
Backup needs suitable switching, protection and control. How long it lasts depends on the load, battery reserve and system losses. Check these conditions before setting a backup time.
Equipment access and space for expansion
The layout needs room for vehicles to enter and leave, drivers to reach the terminals, and service staff to access the cabinets. Battery cooling openings, cable access and electrical equipment doors must remain clear.
Future expansion needs more than spare space. Check the grid connection, switchgear and cable routes before adding equipment. More terminals alone will not raise the output of a shared power cabinet.
Planning a similar station in Nigeria
For commercial EV charging stations, start with the site and its users. Send the country, site location and grid or transformer capacity. A site plan or photographs will help us review the space. Include vehicle types, charging periods and expected daily energy use.
If backup is required, list the circuits to support and how long they must run. Tell us about any existing solar, generators and other site loads.
KUNETIC can use these inputs to assess a system for your site. Discuss a similar project and share your power needs and site details.
Questions before specifying the equipment
Can this station run entirely on solar power?
That needs a separate energy balance. Compare solar output with vehicle demand across the full operating schedule. Allow for battery reserve and seasonal changes. This proposed design does not establish continuous use without grid support.
Do the two charging terminals each provide 120 kW?
The proposed terminals share a 120 kW power cabinet. Power at each vehicle depends on the sharing settings and the vehicle's charging limits. Choose connector types to suit the vehicles that will use the station.
How long can the battery support charging?
Runtime depends on the charging load and usable battery energy. Nominal capacity alone does not give a guaranteed runtime. Include reserve settings and power conversion losses in the calculation.
Can the design be used for another site?
It can provide a starting point for a site review. Check grid capacity, charging demand and space for PV. Local electrical rules also affect which parts of the design need to change.