Solar carport, battery equipment and charging bays in a proposed Nigeria station design
NIGERIAPROJECT DESIGN

PROJECT DESIGN · NIGERIA

Solar EV Charging Station Design in Nigeria

This solar EV charging station design is for a site in Nigeria. It combines 100 kWp of solar PV, 241 kWh of battery storage and a 120 kW DC charging system. KUNETIC's proposed design uses an energy management system to control power flow across the site.

Charging operators can use this design to assess a similar station. The grid connection, vehicle demand and site space guide the choice of equipment. These details also set the limits on charging power.

01

A solar carport with storage and DC charging

The proposed station brings together solar panels, a battery cabinet, a power converter and separate charging terminals. A solar carport can hold the panels above the charging bays. The main electrical equipment sits in a separate service area.

The layout should put solar power to use when vehicles arrive. It must keep charging demand within the available supply and leave room for service access. A site survey and vehicle charging schedule help set the final layout.

Conceptual layout of solar carport charging bays, electrical equipment and maintenance access
Site layout illustration — charging bays and electrical service access.
02

Proposed system configuration

Proposed solar, battery and EV charging equipment ratings
ComponentReference configurationRole in the station
Solar PV100 kWpGenerate power for charging and battery charging
Battery storage241 kWh LFPStore energy for later use
Power conversion system (PCS)125 kWConvert power between the battery and AC system
Solar charge control120 kW MPPTManage power from the PV array
DC charging equipment120 kW power cabinet with two terminalsShare charging power between connected vehicles
Energy management system (EMS)Site controller and monitoringCoordinate equipment operation

These are proposed equipment ratings. The 241 kWh figure is nominal battery energy. Reserve settings and system losses reduce the energy that reaches the vehicles.

The PCS and MPPT perform different jobs. Adding their ratings does not give the station's output. The two terminals share one 120 kW power cabinet. They are not two separate 120 kW EV chargers.

Separate DC charging power cabinet and charging terminals in the proposed station design
Split charging equipment: the terminals share the power cabinet’s output.
03

Equipment price range and what affects it

For a solar EV charging equipment package of a similar scale, allow a reference budget of US$50,000–80,000, on an FOB Shenzhen equipment-supply basis. This is a planning estimate for a customized package, not a fixed price for the exact configuration shown or a maximum price for every project.

The reference scope covers solar PV modules, battery storage with PCS and MPPT, EMS, and split DC charging equipment. KUNETIC supplies equipment; this budget is not a turnkey installed-station price. The final quotation will state the equipment and accessories included.

Your requirements and site conditions affect the equipment selection and price:

  • Available installation area, shading and the PV capacity that can fit on the site.
  • Battery capacity, backup reserve and the hours of operation to support.
  • Charging power, number of terminals and connector standards for your vehicles.
  • Grid or transformer capacity, existing generators and integration requirements.
  • Ambient heat, humidity, corrosion exposure and local electrical requirements.
  • Equipment layout, cable distances, protection devices and monitoring options.

Carport structures, mounting works, foundations, site cabling, civil works, installation and commissioning services are excluded from this reference equipment budget. Freight, insurance, import duties, taxes and local grid upgrades are also excluded. Any additional supplied materials must be itemized in the quotation.

Actual prices depend on the agreed specifications, supply scope and quotation date. Larger systems or additional requirements may fall outside this range. Request a site-specific equipment quotation with your site plan, installation area and charging needs.

04

How solar, the battery and chargers connect

The PV array feeds the storage system through solar charge control. The PCS connects the battery to the site's AC system. The charging power cabinet takes AC power and supplies DC power to the charging terminals.

Meters and safety devices sit between the electrical circuits. The EMS tracks site supply, charging demand and battery state of charge. It uses this data to control power flow within the system's limits.

Conceptual power path from solar and battery storage through site AC equipment to separate DC charging terminals
Solar PVBattery + PCSAC equipmentDC charging
Power connectionsEMS communication
Conceptual architecture. Final wiring, switching and protection follow the project design.

The split design places the terminals near the parking bays. The main power cabinet stays in the service area. Check cable routes, safe spacing and circuit protection for the chosen layout.

For the wider system options, see KUNETIC's PV-ESS-EV charging solutions.

05

Using solar power through the charging day

When solar output and vehicle demand overlap, PV can supply part of the charging load. Surplus solar can charge the battery when the system has spare capacity. The actual split depends on PV output, site demand and the EMS settings.

During cloudy periods or after sunset, the battery can supply part of the load. Its power and stored energy set the limits. Grid power can add to the supply where available. When demand is too high, the station must limit or share charger output.

Illustration of the same solar and battery charging station in sunny and low-solar conditions
01 Solar available02 Low solar / after sunset
Operating modes illustration — actual power flow depends on demand and EMS settings.

A 100 kWp PV rating does not mean 100 kW will be available all day. It also does not tell us how many vehicles the station can charge each day. That estimate needs local solar data, vehicle energy use and arrival times.

Our solar EV charging station guide explains how charging demand and available grid power affect battery sizing.

06

Why include battery storage for EV charging?

Storage gives the operator more control over when to use solar energy. It can help cover a short power gap during a busy charging period. The battery and PCS must have enough capacity to meet that load.

Keeping energy in reserve for backup leaves less for daily charging. Set that reserve level in the operating plan. If backup is needed, name the loads that must keep running during a grid outage.

White battery cabinet with an external cooling unit and maintenance clearance in the proposed design
Battery equipment illustration based on the selected 241 kWh cabinet.

Backup needs suitable switching, protection and control. How long it lasts depends on the load, battery reserve and system losses. Check these conditions before setting a backup time.

07

Equipment access and space for expansion

The layout needs room for vehicles to enter and leave, drivers to reach the terminals, and service staff to access the cabinets. Battery cooling openings, cable access and electrical equipment doors must remain clear.

Future expansion needs more than spare space. Check the grid connection, switchgear and cable routes before adding equipment. More terminals alone will not raise the output of a shared power cabinet.

08

Planning a similar station in Nigeria

For commercial EV charging stations, start with the site and its users. Send the country, site location and grid or transformer capacity. A site plan or photographs will help us review the space. Include vehicle types, charging periods and expected daily energy use.

If backup is required, list the circuits to support and how long they must run. Tell us about any existing solar, generators and other site loads.

KUNETIC can use these inputs to assess a system for your site. Discuss a similar project and share your power needs and site details.

09

Questions before specifying the equipment

Can this station run entirely on solar power?

That needs a separate energy balance. Compare solar output with vehicle demand across the full operating schedule. Allow for battery reserve and seasonal changes. This proposed design does not establish continuous use without grid support.

Do the two charging terminals each provide 120 kW?

The proposed terminals share a 120 kW power cabinet. Power at each vehicle depends on the sharing settings and the vehicle's charging limits. Choose connector types to suit the vehicles that will use the station.

How long can the battery support charging?

Runtime depends on the charging load and usable battery energy. Nominal capacity alone does not give a guaranteed runtime. Include reserve settings and power conversion losses in the calculation.

Can the design be used for another site?

It can provide a starting point for a site review. Check grid capacity, charging demand and space for PV. Local electrical rules also affect which parts of the design need to change.

YOUR SITE. YOUR CHARGING NEEDS.

Discuss a similar
project with KUNETIC.

A site plan, grid capacity and vehicle charging schedule are useful starting points.

Split charging equipment referenced by the proposed station design
Visit our contact page

Plan Your Charging Station

Tell us the country, site power and vehicles to be served.

Minimum 10 characters.

Drag & Drop a Project File Here

PDF, JPG, PNG, WEBP, DOCX, XLSX or ZIP · Max 8 MB