Manage demand peaks
Use interval data and your tariff to plan battery discharge around the building’s costly demand periods.
COMMERCIAL BUILDING ENERGY
Connect rooftop generation, storage and selected critical loads around the way your building operates.
Offices Shopping centres Bank branches

A BUILDING-FIRST ENERGY PLAN
Solar generates electricity. A battery changes when energy is used. A UPS supports power continuity for sensitive loads. A useful commercial building solution gives each a clear role.
KUNETIC works with owners, facilities teams and project partners to define battery equipment and integration requirements. Start with the load profile, existing PV and the landlord or common-area meter.
WHAT SHOULD THE SYSTEM DO?
Use interval data and your tariff to plan battery discharge around the building’s costly demand periods.
Store available solar surplus for later use, matching the charging plan to actual generation and building demand.
Define the circuits, power and duration first. Coordinate storage with the switching equipment and any existing UPS.
Review existing PV, switchboards, cable routes and service access before deciding how storage connects.
Keep landlord and tenant meters, roof rights and common-area loads clear in the equipment and control scope.
Assess parking-area charging as an optional load. Coordinate charger demand with the site’s available power.

ROOFTOP GENERATION. REAL BUILDING DEMAND.
Solar panels for commercial buildings are one part of the picture. The meter, the hours of use and the electrical connection determine where storage can add a useful energy resource.
THREE BUILDINGS. DIFFERENT PRIORITIES.
Explore how the building changes the questions we ask.

DAYTIME OPERATIONS / COMMON-AREA LOADS
Compare office hours, cooling demand and rooftop generation. Commercial battery storage can shift available energy and manage defined peaks on the meter it actually serves.

LONGER OPENING HOURS / SHARED FACILITIES
Retail lighting, ventilation and common-area services can stay busy after solar production falls. Plan commercial solar battery storage around the centre’s opening hours and shared electrical supply.

SELECTED CIRCUITS / POWER CONTINUITY
Start with the branch network, security and selected business equipment. Define acceptable transfer time and runtime, then coordinate the UPS and battery storage around those requirements.
WORK WITH WHAT IS ALREADY THERE
Storage can be evaluated with existing commercial solar power or as a grid-charged system where rooftop PV is not available.
For a retrofit, an AC-coupled route may fit alongside the existing inverter. Confirm its electrical ratings, export arrangement, metering and control compatibility before choosing equipment.
In a multi-tenant building, establish who owns the roof and which supply the system serves. Separate tenant meters and landlord permissions shape the system boundary.
Discuss Your Existing Building
HOW THE EQUIPMENT FITS TOGETHER
Choose the operating duty before the equipment package.
SPECIFY THE RIGHT EQUIPMENT ROLE
Compare AC power, installed energy and power continuity as separate requirements.

50 kW / 120 kWh
A cabinet route combining battery storage and power conversion.
The published K-eBank 50 kW / 120 kWh model is one option for commercial buildings. Match its power, usable energy, operating modes and electrical ratings to the site. Confirm the final solar, switching and control interfaces in the proposed package.
View K-eBank Cabinet
Up to 120 kWh installed
Battery capacity selected alongside an external power conversion system.
eBlock is a DC battery cabinet with up to 120 kWh maximum installed capacity. An external PCS and associated electrical equipment are required. Agree the battery voltage range, conversion rating, protection and EMS communication before specifying the system.
View eBlock Cabinet
10–120 kVA
A separate equipment role for sensitive, selected building loads.
The three-phase industrial UPS series spans 10–120 kVA. Select the model around input and output ratings, load characteristics, battery configuration and autonomy. Coordinate it with the building’s upstream supply and any proposed energy storage system.
Discuss UPS RequirementsFROM REQUIREMENTS TO AN EQUIPMENT BRIEF
Start with what the building uses and when.
Make the physical and electrical interfaces clear.
Turn the agreed duty into an equipment brief.
Agree responsibilities with the project team.
THE INFORMATION THAT MOVES IT FORWARD
Share what is available. We can identify the remaining inputs together.
| Project input | What to provide |
|---|---|
| Site & electrical supply | Country, utility connection, supply voltage and frequency; proposed project timing. |
| Bills & interval demand | Recent electricity bills, tariff details and interval load data, where available. |
| Roof & meter ownership | Roof or parking rights, landlord and tenant meters, common-area supply and export arrangement. |
| Selected backup circuits | Running power, start-up requirements, acceptable transfer time and required support duration. |
| Existing power equipment | PV and inverter details, UPS and generator information, plus a single-line diagram if available. |
| Installation conditions | Photos of the equipment area, access and cable routes; environmental conditions and local project responsibilities. |
On smaller screens, swipe across the table.

TALK TO KUNETIC
Share the site, the operating goal and the equipment already in place. We can review a commercial battery storage route with your project team.
For building owners, facilities teams, EPCs and system integrators.
COMMERCIAL BUILDING STORAGE, EXPLAINED
Yes. A grid-connected battery can charge from the utility supply and discharge according to an agreed schedule. Evaluate the tariff, measured load, connection limits, conversion losses and equipment cost before choosing this route.
Only when the system is designed for that duty. It needs suitable conversion, grid isolation, switching, protection and controls, plus enough power and usable energy for the selected loads. A grid-connected solar installation alone does not establish backup capability.
Sensitive network, security or business equipment may need a UPS to meet its power continuity requirement. Site battery storage has a separate energy management role. Determine acceptable interruption and autonomy at each critical circuit, then coordinate the systems.
An AC-coupled route can often be assessed alongside existing PV. Suitability depends on inverter equipment, electrical ratings, metering, controls, export conditions and local connection requirements. Share the existing equipment list and single-line drawing for review.
A battery serves the electrical circuits within its defined connection boundary. Separate tenant meters, landlord supplies and common-area loads affect which loads can use the energy and how it is measured. Confirm ownership, permissions and metering before sizing equipment.
Start with the required power in kW and the energy duty in kWh. Use interval demand, intended discharge hours and selected backup loads, then account for usable capacity, conversion losses, reserve settings and ageing. Floor area alone is not a sufficient sizing method.
Share the country, supply ratings, recent bills, interval demand where available, existing PV or UPS details, meter arrangement and installation photos. For backup, add the selected circuit list, required power, acceptable interruption and duration.
KEEP EXPLORING

Explore capacity, equipment choices and the questions to ask before selecting a system.
Read the Guide
Look at the components and planning decisions behind commercial solar power.
Read the Guide
Understand demand peaks, meter data and how battery dispatch can be evaluated.
Read the Guide