Reliable Energy Storage — Download Free Catalog Download Now

COMMERCIAL BUILDING ENERGY

Commercial Solar Power & Battery Storage for Buildings

Connect rooftop generation, storage and selected critical loads around the way your building operates.

Offices Shopping centres Bank branches

Contemporary commercial office building with rooftop solar and a discreet outdoor battery installation

A BUILDING-FIRST ENERGY PLAN

Make the energy plan
fit the building.

Solar generates electricity. A battery changes when energy is used. A UPS supports power continuity for sensitive loads. A useful commercial building solution gives each a clear role.

KUNETIC works with owners, facilities teams and project partners to define battery equipment and integration requirements. Start with the load profile, existing PV and the landlord or common-area meter.

WHAT SHOULD THE SYSTEM DO?

Put building operations first.

Manage demand peaks

Use interval data and your tariff to plan battery discharge around the building’s costly demand periods.

Use more rooftop solar

Store available solar surplus for later use, matching the charging plan to actual generation and building demand.

Support selected loads

Define the circuits, power and duration first. Coordinate storage with the switching equipment and any existing UPS.

Plan a practical retrofit

Review existing PV, switchboards, cable routes and service access before deciding how storage connects.

Respect tenant interfaces

Keep landlord and tenant meters, roof rights and common-area loads clear in the equipment and control scope.

Allow for EV charging

Assess parking-area charging as an optional load. Coordinate charger demand with the site’s available power.

Wide commercial rooftop with solar panels overlooking the surrounding city

ROOFTOP GENERATION. REAL BUILDING DEMAND.

Look beyond the available roof.

Solar panels for commercial buildings are one part of the picture. The meter, the hours of use and the electrical connection determine where storage can add a useful energy resource.

THREE BUILDINGS. DIFFERENT PRIORITIES.

A plan for the place you operate.

Explore how the building changes the questions we ask.

Solar-roof office building with battery equipment in its outdoor service area

DAYTIME OPERATIONS / COMMON-AREA LOADS

Make the workday part of the plan.

Compare office hours, cooling demand and rooftop generation. Commercial battery storage can shift available energy and manage defined peaks on the meter it actually serves.

  • Map landlord and tenant electricity meters.
  • Compare weekday demand with weekends and holidays.
  • Confirm the circuits included in any backup plan.
See What to Share
Shopping centre with evening lighting, parking and outdoor DC battery equipment

LONGER OPENING HOURS / SHARED FACILITIES

Follow the load beyond daylight.

Retail lighting, ventilation and common-area services can stay busy after solar production falls. Plan commercial solar battery storage around the centre’s opening hours and shared electrical supply.

  • Separate common services from tenant loads.
  • Review evening demand and seasonal trading hours.
  • Include parking and EV charging only where required.
See What to Share
Contemporary bank branch building with a dedicated rear electrical service area

SELECTED CIRCUITS / POWER CONTINUITY

Give critical circuits a clear role.

Start with the branch network, security and selected business equipment. Define acceptable transfer time and runtime, then coordinate the UPS and battery storage around those requirements.

  • Identify sensitive equipment and its UPS supply.
  • Agree the supported load and required autonomy.
  • Check generator, switching and restoration interfaces.
See What to Share

WORK WITH WHAT IS ALREADY THERE

An existing roof.
A changing load.

Storage can be evaluated with existing commercial solar power or as a grid-charged system where rooftop PV is not available.

For a retrofit, an AC-coupled route may fit alongside the existing inverter. Confirm its electrical ratings, export arrangement, metering and control compatibility before choosing equipment.

In a multi-tenant building, establish who owns the roof and which supply the system serves. Separate tenant meters and landlord permissions shape the system boundary.

Discuss Your Existing Building
Battery equipment in the service area of an existing office building

HOW THE EQUIPMENT FITS TOGETHER

Three routes into the building.

Choose the operating duty before the equipment package.

Conceptual cutaway of a commercial building showing rooftop solar, electrical distribution and battery equipment
01Solar PV02Building distribution03PCS + battery04Metering & EMS
Concept arrangement. Connections and equipment scope follow the project electrical design.

01 / Solar & storage

Generate in daylight. Use energy when it fits.

Commercial solar power serves the building when generation and demand overlap. Battery storage can hold available surplus for later use, with the energy management system coordinating charging, discharge and the grid connection.

For existing PV, assess an AC-coupled connection alongside the current inverter. An eBlock DC cabinet needs an external PCS; an integrated cabinet has a different equipment boundary.

Explore Equipment Options
Conceptual commercial building without rooftop solar, showing the grid supply and battery equipment
01Utility supply02Site meter03PCS + battery04Scheduled loads
Concept arrangement. Connections and equipment scope follow the project electrical design.

02 / Grid-charged storage

No solar roof? Start with the meter.

Commercial battery storage can charge from the grid and discharge according to an agreed operating schedule. The useful duty depends on tariff periods, measured demand, connection limits and the power available for charging.

Compare the proposed daily schedule with usable battery energy, losses and any reserved capacity. Storage does not create energy, and an attractive tariff spread alone does not establish project value.

Explore Equipment Options
Industrial UPS equipment in a bank branch electrical room for selected critical circuits
01Grid / generator02Switching & protection03UPS04Selected critical loads
Concept arrangement. Connections and equipment scope follow the project electrical design.

03 / UPS & selected loads

Define continuity at the equipment that matters.

A UPS supports the sensitive power path. A battery storage system can contribute energy to an agreed backup architecture when suitable conversion, isolation, switching and controls are included.

Specify the supported circuits, acceptable interruption and required duration. Confirm the transfer behavior of the complete system and how the reserve will be restored after an outage.

Explore Equipment Options

SPECIFY THE RIGHT EQUIPMENT ROLE

A cabinet is the start.
The duty defines the system.

Compare AC power, installed energy and power continuity as separate requirements.

K-eBank cabinet with its attached power-conversion compartment in an office service courtyard

50 kW / 120 kWh

K-eBank all-in-one

A cabinet route combining battery storage and power conversion.

Equipment details

The published K-eBank 50 kW / 120 kWh model is one option for commercial buildings. Match its power, usable energy, operating modes and electrical ratings to the site. Confirm the final solar, switching and control interfaces in the proposed package.

View K-eBank Cabinet
DC battery cabinet in a shopping centre service area

Up to 120 kWh installed

eBlock DC cabinet

Battery capacity selected alongside an external power conversion system.

Equipment details

eBlock is a DC battery cabinet with up to 120 kWh maximum installed capacity. An external PCS and associated electrical equipment are required. Agree the battery voltage range, conversion rating, protection and EMS communication before specifying the system.

View eBlock Cabinet
Industrial UPS towers in a dedicated bank electrical room

10–120 kVA

Industrial UPS series

A separate equipment role for sensitive, selected building loads.

Equipment details

The three-phase industrial UPS series spans 10–120 kVA. Select the model around input and output ratings, load characteristics, battery configuration and autonomy. Coordinate it with the building’s upstream supply and any proposed energy storage system.

Discuss UPS Requirements

FROM REQUIREMENTS TO AN EQUIPMENT BRIEF

A clear path through the project.

01

Understand the load

Start with what the building uses and when.

  • Electricity bills & tariff
  • Interval meter data
  • Operating & occupancy hours
02

Map the site

Make the physical and electrical interfaces clear.

  • Roof & meter ownership
  • Electrical drawings & equipment
  • Space, access & cable routes
03

Define the equipment

Turn the agreed duty into an equipment brief.

  • Battery power & energy
  • PCS, UPS & control roles
  • Ratings & market requirements
04

Coordinate handover

Agree responsibilities with the project team.

  • Supply & installation scope
  • Commissioning & settings
  • Documentation & maintenance
Commercial shopping centre lit at dusk with outdoor energy equipment

A USEFUL PROPOSAL STARTS ON SITE

Keep the project
grounded in the site.

Prepare Your Project Inputs

THE INFORMATION THAT MOVES IT FORWARD

Bring the building into the brief.

Share what is available. We can identify the remaining inputs together.

Project inputs for equipment selection and integration review.
Project inputWhat to provide
Site & electrical supplyCountry, utility connection, supply voltage and frequency; proposed project timing.
Bills & interval demandRecent electricity bills, tariff details and interval load data, where available.
Roof & meter ownershipRoof or parking rights, landlord and tenant meters, common-area supply and export arrangement.
Selected backup circuitsRunning power, start-up requirements, acceptable transfer time and required support duration.
Existing power equipmentPV and inverter details, UPS and generator information, plus a single-line diagram if available.
Installation conditionsPhotos of the equipment area, access and cable routes; environmental conditions and local project responsibilities.

On smaller screens, swipe across the table.

Commercial building architecture and its rooftop solar installation

TALK TO KUNETIC

Tell us about
your building.

Share the site, the operating goal and the equipment already in place. We can review a commercial battery storage route with your project team.

  1. Share the requirement.Building, meter, load and intended energy duty.
  2. Review the interfaces.PV, battery, conversion, UPS and controls.
  3. Define the proposed scope.Equipment configuration and the next engineering inputs.

Request a Building Proposal

For building owners, facilities teams, EPCs and system integrators.

Minimum 10 characters.

Drag & Drop a Project File Here

PDF, JPG, PNG, WEBP, DOCX, XLSX or ZIP · Max 8 MB

COMMERCIAL BUILDING STORAGE, EXPLAINED

Questions before you specify.

Can commercial battery storage work without solar panels?

Yes. A grid-connected battery can charge from the utility supply and discharge according to an agreed schedule. Evaluate the tariff, measured load, connection limits, conversion losses and equipment cost before choosing this route.

Can solar and storage keep a commercial building running during an outage?

Only when the system is designed for that duty. It needs suitable conversion, grid isolation, switching, protection and controls, plus enough power and usable energy for the selected loads. A grid-connected solar installation alone does not establish backup capability.

Does a bank branch need a UPS as well as battery storage?

Sensitive network, security or business equipment may need a UPS to meet its power continuity requirement. Site battery storage has a separate energy management role. Determine acceptable interruption and autonomy at each critical circuit, then coordinate the systems.

Can storage be added to an existing commercial solar system?

An AC-coupled route can often be assessed alongside existing PV. Suitability depends on inverter equipment, electrical ratings, metering, controls, export conditions and local connection requirements. Share the existing equipment list and single-line drawing for review.

How do tenant meters affect the system design?

A battery serves the electrical circuits within its defined connection boundary. Separate tenant meters, landlord supplies and common-area loads affect which loads can use the energy and how it is measured. Confirm ownership, permissions and metering before sizing equipment.

How much battery capacity does a commercial building need?

Start with the required power in kW and the energy duty in kWh. Use interval demand, intended discharge hours and selected backup loads, then account for usable capacity, conversion losses, reserve settings and ageing. Floor area alone is not a sufficient sizing method.

What information is needed for a building proposal?

Share the country, supply ratings, recent bills, interval demand where available, existing PV or UPS details, meter arrangement and installation photos. For backup, add the selected circuit list, required power, acceptable interruption and duration.