Reliable Energy Storage — Download Free Catalog Download Now
Container battery storage, separate electrical equipment and a solar canopy at an industrial site at dawn

CONTAINER BESS

Containerized Battery
Energy Storage Systems

From integrated microgrids to multi-container storage.
Find the configuration that fits your site.

Compare Configurations

Choose the architecture

Match power and energy

Define the supply scope

STORAGE BUILT AROUND YOUR SITE

More Than a Battery in a Container

Choose container battery storage around the way your site uses power. KUNETIC helps industrial and commercial projects compare integrated microgrids, separate battery containers and larger multi-container systems.

If you are comparing BESS units for sale, start with three questions: how much power is needed, how much energy must be stored, and which equipment belongs in the supply scope?

Discuss Your Project

How a Containerized BESS Fits Your Site

Conceptual system diagram: battery container connects through a PCS and AC switchgear to the grid and site loads; solar connects through a separate PV inverter
Illustrative system topology, not an electrical construction drawing. Solar connects through its inverter; the selected design determines voltage, protection and equipment scope.

A containerized battery energy storage system houses batteries and supporting equipment in one or more enclosures. The design determines what is inside and what is supplied separately.

The batteries store energy. The PCS converts power between the DC batteries and the AC installation. The EMS coordinates charging and discharging.

Grid support, solar shifting and backup are different tasks. Backup also needs suitable switching, isolation and controls.

The Right System Starts With the Load

AC power determines what can run together.
Battery energy determines how long it can run.

Container size alone cannot answer either question.

Choose Storage Around Your Operating Needs

Container battery storage serving an industrial site

Peak demand

Short production peaks can drive demand charges. Storage can supply part of that peak when the tariff and operating schedule support it. Start with interval load data and the electricity bill.

Explore peak shaving
Solar generation paired with container battery storage

Solar self-use

Solar production and site demand may peak at different times. Store surplus energy for later loads. Compare the PV generation profile with evening demand, export limits and charging capacity.

Explore commercial storage
Supplier equipment photograph of a container energy storage enclosure with open access doors

Grid capacity

New equipment may push demand above the available grid connection. Storage can support selected periods of higher demand. Check the connection limit, peak duration and time available to recharge.

Discuss your connection limit
Battery storage containers in an equipment yard

Backup & microgrids

Essential loads may need power during an outage or at a remote site. Backup needs compatible conversion, switching and controls. Define the loads, starting demand and operating hours before choosing capacity.

Explore hybrid power

What Is Included in Your BESS Configuration?

Compare the complete equipment list, alongside battery capacity.

Battery & BMS

Stored energy and battery monitoring. Review rated energy, operating limits and usable energy for the selected model.

Power conversion

The PCS connects DC battery energy to the AC installation. Its power rating and operating modes must match the site.

Cooling & protection

Temperature control, detection and protection form part of the equipment design. Confirm the selected configuration.

System control

The EMS coordinates charging and discharging. Agree its interfaces with the grid, solar and any generator controls.

AC switchgear and a transformer may be separate equipment. Existing solar or a generator also needs compatible connections and controls.

Define Your Equipment Scope

ONE SITE. DIFFERENT SYSTEM ARRANGEMENTS.

Choose How the System Comes Together

The location of the PCS, controls and AC equipment changes the supply scope, installation plan and connection design.

01

Integrated microgrid

Batteries, conversion and selected controls brought together. Check the generation interfaces and backup scope.

02

Battery container

Battery energy separated from AC equipment. Match DC limits to the external PCS and connection design.

03

Multi-container system

Several battery enclosures with separate conversion and transformer equipment. Plan the complete site layout.

Open battery racks and fan-cooled power electronics in a factory yard
Internal equipment arrangement

INTEGRATED CONFIGURATIONS

Bring Storage and Conversion Together

An integrated arrangement brings batteries, power conversion and selected controls together. It can suit projects that need a defined combination of storage and generation interfaces.

Confirm the PV, grid, generator and backup scope for the chosen model.

View the Integrated 750 kW System
Battery modules and a separate controls compartment in an open container
Battery and controls compartments

SEPARATE EQUIPMENT ARRANGEMENTS

Match the AC Side to the Project

A separate battery container allows the PCS and AC equipment to be selected around the site. Compare battery energy and DC limits with the external PCS specification.

A battery compartment's DC rating is not the complete system's AC output. Larger installations also need space for separate equipment and maintenance access.

Discuss a Container Configuration

Battery energy is one part of the quotation

Check the equipment and interfaces together

MODEL & CONFIGURATION REFERENCES

Compare Containerized BESS Units for Sale

Integrated microgrids and centralized storage have different equipment arrangements.
Compare AC power, battery energy and connection requirements separately.

Grey K-ePowerMax C1440 container enclosure with ventilation louvers and access doors
K-ePowerMax-C1440 · product photograph

INTEGRATED MICROGRID REFERENCE

K-ePowerMax-C1440

750 kW AC1.446 MWh

Integrated PCS with a maximum PV input of 720 kW. Reference connection: 400 V, 50/60 Hz.

STS is configurable. A diesel generator is not default supply. Rated battery energy is not usable AC energy.

View Full Product Specifications
Container BESS configuration comparison
Configuration referenceRated battery energyAC powerEquipment arrangementReference connection
K-ePowerMax-C14401,446.912 kWh750 kWIntegrated PCS
Maximum PV input 720 kW
400 V
50/60 Hz
Approx. 5 MWh centralized system5,015.9616 kWh2,500 kWBattery container + separate PCS/transformer690 V
50 Hz
Approx. 10 MWh centralized system10,031.9232 kWh2,500 kWTwo battery containers + separate PCS/transformer690 V
50 Hz

Model-specific datasheet references, not interchangeable standard packages. The 5 MWh and 10 MWh examples describe 690 V, 50 Hz designs; other connections require review. Total installation space includes access, connections and separate equipment.

What Determines BESS Container Price and Size?

Loads & operating hours

The simultaneous load sets the power requirement. The hours to be covered, usable battery energy and reserve settings affect storage capacity. Motor starting demand needs a separate check.

Operating mode & connection

Grid support, solar shifting and backup need different controls and equipment. Include the country, voltage, frequency, connection limit and any existing PV or generator system.

Equipment & document scope

Compare batteries, PCS, EMS, switchgear and transformer scope together. Identify the testing, technical documents and project requirements that apply to the selected model.

Site work & delivery

Allow for transport, unloading, foundations, service access and cable routes. A battery container footprint does not describe the space needed for the complete installation.

Make Two Quotations Easier to Compare

Similar battery capacity can hide a very different supply scope.

Equipment list

Identify what is included, what is optional and what is supplied separately.

Connection points

State the battery, PCS, switchgear and transformer interfaces.

Installation scope

Agree transport, site preparation, commissioning and project responsibilities.

“Start with what needs power —
then choose the system around it.”

Location, operating hours and connection limits turn a container enquiry into a useful configuration discussion.

What to Share With Your Enquiry

01Project country
02Loads & hours
03Voltage & frequency
04Existing generation

Electricity bills, a load profile or a site plan help. You can begin by describing the problem you need to solve.

From Site Requirements to a Defined Supply Scope

Illustrated proposal workflow: review site requirements, compare system architecture, then define equipment and supply scope
Illustrative planning sequence · equipment arrangement depends on the selected model.
  1. 1

    Define the site requirement

    Share the location, loads and operating objective. Add electricity bills, a load profile and existing solar or generator details when available. Estimates are enough to begin.

  2. 2

    Compare the system architectures

    Match AC power and battery energy to the operating schedule. Compare integrated systems with separate battery, PCS and transformer arrangements. Record the equipment included in each option.

  3. 3

    Agree the equipment and interfaces

    Before ordering, check the supply list, electrical connections, project documents and installation responsibilities. Use the selected configuration to confirm transport, site preparation and commissioning requirements.

Discuss Your Container BESS Project

Tell us what needs power and when it runs. Include the project country and whether the priority is peak demand, solar self-use, grid capacity or backup.

Get a Configuration Proposal

BESS Container Selection FAQs

What is included in a BESS container?

It depends on the architecture. A battery container houses batteries and supporting systems, such as battery management and cooling. An integrated configuration may also contain power conversion and controls. Check the supply list for the PCS, transformer, switchgear and other equipment.

What is the difference between MW and MWh?

MW measures power: how quickly the system can supply energy. MWh measures stored energy. A 1 MW load uses 1 MWh over one hour. Actual operating time also depends on usable battery energy, reserve settings, conversion losses and equipment limits.

How do I choose BESS container capacity?

Start with the load profile, operating objective and hours to be covered. Check AC power separately from battery energy. Then review charging time, starting loads and the reserve required. A 20-foot or 40-foot enclosure size alone does not determine the right capacity.

Does every container include a PCS and transformer?

No. Some systems combine batteries and a PCS; others use separate enclosures. A transformer depends on the connection voltage and project design. The quotation should identify which components are supplied, where they are located and which interfaces remain site responsibilities.

Can a container BESS provide backup power?

Yes, when the complete installation is designed for backup. The PCS, isolation and switching equipment, controls and connected loads must support that mode. A grid-tied battery installation does not automatically continue supplying loads during an outage.

Can it work with existing solar or diesel equipment?

It can form part of a compatible hybrid system. Share the PV inverter and generator models, ratings and control details. The review needs to cover connections, switching and operating modes. Existing equipment compatibility must be checked for the chosen configuration.

What affects BESS container price?

Battery energy, AC power, equipment scope and project requirements all affect price. Compare PCS, transformer, protection and controls as well as the battery package. Transport, site work and required documentation also matter. A cost per kWh alone does not describe a complete system.

What information do you need for a proposal?

Start with the country, project objective, approximate load and operating hours. Add voltage, frequency, existing solar or generator details and a site plan if available. Bills and interval load data improve the assessment, but you can begin by describing the problem you need to solve.

Which project documents are available?

Request the documents for the selected model and supply scope. The review should identify applicable datasheets, layout information, electrical diagrams and test or certification records. Document applicability needs to match the actual equipment and project requirements; a general product-family claim is not enough.

Discuss Your Container BESS Project

Share your loads, operating hours and project location. We will use these details to start the configuration discussion.

Minimum 10 characters.

Drag & Drop a Project File Here

PDF, JPG, PNG, WEBP, DOCX, XLSX or ZIP · Max 8 MB