Reliable Energy Storage — Download Free Catalog Download Now
eBlock outdoor battery storage cabinet, full product view

OUTDOOR DC BATTERY CABINET

eBlock 120kWh Outdoor Battery Storage Cabinet

eBlock is an outdoor battery storage cabinet for factories and industrial sites. Each cabinet offers up to 120 kWh of installed battery capacity. Battery management and temperature control are built in. This is a DC battery cabinet. It needs an external power conversion system (PCS) to connect to your site’s AC power system. Explore the specifications below, or share your site needs for a project quote.

120kWh Max. Installed Capacity
336–432V DC Voltage Range
LFP Battery Chemistry
IP54 Outdoor Protection
OUTDOOR C&I ENERGY STORAGE

Industrial battery storage for your site

Plan storage around your power use, solar output and the loads that matter most.

eBlock cabinet with maximum installed capacity, HVAC and enclosure protection highlights
120 kWhMax. installed
Built-inHVAC
IP54Enclosure
THE BATTERY CABINET

A 120kWh battery cabinet with built-in controls

eBlock uses lithium iron phosphate (LFP) batteries. The cabinet houses the batteries, controls and cooling equipment in one unit. A battery management system (BMS) manages the battery system.

Battery storage
Up to 120 kWh of installed capacity per cabinet. Check usable energy as part of your system design.
Outdoor enclosure
An IP54 enclosure made from 304 stainless steel, with corrosion-resistant paint.
System integration
Choose an external PCS and site controls to suit the battery voltage and your load.
Explore the specifications
INSIDE THE CABINET

Inside the cabinet: batteries, controls and cooling

The open-cabinet view shows the battery system, control area and door-mounted temperature control unit.

01

Temperature control

Built-in heating, ventilation and air conditioning (HVAC) controls the cabinet environment. Plan space for airflow and service access before you choose its location.

02

Detection and fire protection

The cabinet includes smoke, temperature and flood detection. It also has automatic fire suppression. Check the equipment scope for your chosen model in the project quote.

Illustration based on the product catalogue. Component positions depend on the selected model.
CAPACITY & CONFIGURATION

Compare 120, 240 and 480 kWh arrangements

The catalogue shows one, two and four cabinets. Use these layouts to discuss the space and capacity your site needs.

Catalogue-based comparison of one, two and four eBlock battery cabinets
120 kWhSingle cabinet
240 kWhTwo cabinets
480 kWhFour cabinets

These figures show maximum installed capacity. Usable energy will differ. kWh measures energy; kW measures power. The battery limits and chosen PCS determine system power. Confirm connections and equipment before ordering.

Read the storage sizing guide
FACTORY & INDUSTRIAL APPLICATIONS

Solar storage, peak shaving and backup power

A battery energy storage system needs more than a battery cabinet. With suitable power conversion and controls, your project can target the uses below.

Illustrative eBlock cabinet at a factory with rooftop solar
Factory application concept; not a photograph of a completed installation.

Use more of your solar power

Store surplus solar energy during the day for a later shift. Start by comparing your solar output with when the factory uses power. Check your existing inverter and site controls before adding battery storage.

Peak shaving for high-demand periods

Use stored energy during peaks in site demand to reduce power drawn from the grid. This may help where your tariff includes demand charges. Your load data, peak duration and battery power limits will guide the design.

Backup power for key loads

Plan a backup power supply around the equipment you need to keep running. The complete system needs a suitable PCS, switching and controls. Share each load’s power needs and required run time. The battery cabinet alone cannot provide backup.

SYSTEM INTEGRATION

How the battery cabinet connects to your site

eBlock stores DC energy. An external PCS converts power between the battery and the site’s AC system.

Conceptual AC-coupled layout. Final switching, protection and controls depend on the project.

Included in the cabinet

LFP batteries, battery management, HVAC, detection and automatic fire suppression.

Designed for your project

The external PCS, switching and site controls must work with your battery voltage and loads. Energy management also depends on how you want to charge and use the stored power.

TECHNICAL SPECIFICATIONS

eBlock model specifications

Compare the catalogue specifications for eBlock-120F and eBlock-120F2.

MODEL
eBlock-120F
Battery & Electrical
Battery chemistryLithium iron phosphate (LFP)
Battery configuration1P120S
Maximum installed capacity120 kWh
DC voltage range336–432 Vdc
Battery managementBuilt-in BMS
Cabinet & Installation
Dimensions, L × D × H1315 × 750 × 2095 mm, including HVAC
Enclosure material304 stainless steel
Surface protectionCorrosion-resistant paint
Ingress protectionIP54
Operating Environment
Operating temperature−20°C to 45°C
Installation altitudeBelow 2,000 m
Relative humidity0–95%, non-condensing
Thermal Management & Safety
Thermal managementBuilt-in HVAC
Smoke detectionIncluded
Temperature detectionIncluded
Flood detectionIncluded
Fire protectionAutomatic fire suppression system
Model-Specific Details
Listed control / distribution accessoryPDU
Catalogue gross weight1450 kg

Source: eBlock Series Battery Cabinet catalogue, December 2025. Check final capacity and included equipment in your project quote.

Technical data coverTechnical Data

Downloads

eBlock Technical Data

Download cabinet details and compare the two model specifications.

PROJECT QUESTIONS

Questions about industrial battery storage

Use these answers to prepare for a site assessment.

How long can a 120kWh battery cabinet power our equipment?

Run time depends on the load and usable battery energy. Installed capacity is not the energy available at the AC output. Allow for system losses and operating limits. Share the load in kW and the hours you need it to run. We can then review the battery and PCS sizing.

Can eBlock work with our existing solar system?

It can form the battery storage part of a solar project. First, check the existing inverter, battery voltage and site controls. Send your inverter model and a system diagram if you have one. These details help the project team check whether the equipment can work together.

Does the cabinet include a PCS for backup power?

No. eBlock is a DC battery cabinet and requires an external PCS. For backup power, the design also needs suitable switching and controls. Tell us which loads must keep running, their starting power needs and how long a power break they can accept.

Can peak shaving lower our electricity bill?

It may help if your tariff charges for peak demand. Start with recent bills and load readings across the day. The size and length of each peak affect the result. Energy prices, losses and project costs also matter. Battery capacity alone cannot show savings or payback.

What do you need for a storage quote?

Start with your site country, recent power bills and production hours. Add load data if you have it. For a solar project, include the solar capacity and inverter model. For backup, list the key loads and run time needed. Site photos and an electrical diagram also help.

Request a Project Quote

Tell us about your site load, PV capacity, backup requirements, or target project size. Our engineers will help configure the right system for your needs.