PROJECT DESIGN
Off-Grid Solar EV Charging Station in Benin
At the proposed solar EV charging station in Benin, cars would turn toward the DC fast-charging bays. E-trikes and e-bikes would head for their own rows. The layout gives each group room to wait and turn. During the busiest hour, all three areas share the same power supply.
The design calls for 2.20 MWp of solar PV and 1.928 MWh of nominal battery storage. A 1 MW rated power conversion system would supply the three areas. The car bays would use a shared 720 kW DC charging cabinet.
One site for three kinds of vehicles
The car lane runs around the larger bays, where six dual-connector dispensers would serve vehicles parked alongside the charging island. Two separate covered rows give e-trikes and e-bikes space to pull in, plug in and wait without blocking the car lane. The e-trike row needs room for wider vehicles to turn. The e-bike row can fit more charging positions into a smaller footprint.
Behind the car bays, the site plan sets aside a service area for the battery container and central DC charging cabinet. Keeping technician access off the main circulation lanes would let the operator reach the equipment while drivers use the bays. The solar layout uses both charging canopies and adjacent ground-mounted arrays. That ground area matters when screening a site for an array of this size.
What the station is designed to serve
The proposal models about 10.7 MWh on a design day. It assigns 7.2 MWh to cars, 1.54 MWh to e-trikes and 1.92 MWh to e-bikes, plus a small allowance for auxiliary loads. The estimate uses assumed vehicle battery capacities, charging positions and cycles. Actual arrival times and energy per session will show whether drivers need brief top-ups between trips or longer sessions at the end of the day.
Use daily energy to size the array and plan what to carry into the evening. Then check the busiest window on its own. A day can fit the energy forecast and still strain the station when several cars and trikes arrive together.
How solar and storage feed the charging areas
The equipment schedule lists 3,544 modules at 620 Wp each. DC/DC converters with maximum power point tracking (MPPT) connect the panels to the DC side of the power system. Eight 125 kW power conversion system (PCS) modules feed a common 400 V AC bus.
The bus supplies the car charging cabinet and the two light-vehicle charging areas. The central car cabinet delivers DC to its dispensers. The 2.20 MWp array supplies power on the DC side. The PCS has a rated capacity of 1 MW on the AC side.
The proposed 20 ft air-cooled battery container houses eight 241 kWh clusters. Spare solar power can charge them during quieter periods. Battery storage for EV charging can cover part of the shortfall when clouds pass or more vehicles plug in.
Sharing power at the busiest hour
Several cars might already be fast charging when a group of trikes returns for a top-up. All six car dispensers draw from the same 720 kW charging cabinet. The power each car gets depends on what it can accept and how many others are plugged in. The site also needs room in its power budget for the light-vehicle rows, auxiliary loads and charger losses.
For EV charging load management, the proposed energy management system (EMS) would set a site-wide limit based on available solar and battery power. With compatible charger controls, the operator could reserve power for vehicles due back on the road sooner and run longer-stay sessions at lower power. Set those priorities before choosing the terminal controls.
What happens after sunset
The design assigns about 1.60 MWh of demand to hours with little or no solar output. Starting from a full charge and holding a 10% reserve, the 1.928 MWh battery would have about 1.74 MWh available on the DC side before conversion losses. A busy afternoon or a long spell of cloud could leave less available at dusk. That makes the charge level before the evening rush worth tracking.
If evening service is important, include the required charging sessions in the operating plan and protect enough battery energy ahead of that window. The proposal also considers a separately priced diesel generator for extended periods of weak solar production. Its role depends on how much service the operator needs to maintain during those periods.
Equipment scope and planning budget
| Equipment | Proposed configuration | Planning scope |
|---|---|---|
| Solar PV and MPPT | 3,544 × 620 Wp modules, about 2.20 MWp, with DC/DC MPPT equipment | PV and storage power equipment |
| Containerized battery storage | One 20 ft air-cooled unit with eight 241 kWh clusters, 1.928 MWh nominal, with fire protection | PV and storage power equipment |
| PCS and controls | Eight 125 kW PCS modules, 1 MW rated in total, plus EMS | PV and storage power equipment |
| Car charging | 720 kW shared DC charging cabinet and six dual-connector dispensers | Quoted separately |
| E-trike charging | Twelve dual-connector terminals with dedicated distribution | Quoted separately |
| E-bike charging | Twenty-four dual-connector terminals with dedicated distribution | Quoted separately |
The proposed planning range for the PV and storage power equipment is US$580,000–680,000. This covers the modules, MPPT, containerized battery, PCS and EMS listed above. The three groups of charging equipment, solar support structures, external distribution and field cabling, and any standby generator are quoted separately. Allow separately for freight, import charges, installation and site commissioning.
What to confirm before specifying the site
Start with a site plan that shows the entrances, waiting areas, PV footprint and service access. Then share the vehicle models, connector requirements, busiest arrival hour and typical parking time for each zone. Those details help turn the layout into a charging schedule and determine how much power the car bays and light-vehicle areas need at the same time.
With local solar data and an evening charging schedule, the engineering team can estimate how often the battery would reach its reserve and whether the site needs backup power. Explore KUNETIC’s commercial EV charging solution or compare the off-grid car charging design in Côte d’Ivoire. Send the site plan and your expected charging schedule to discuss a configuration for your fleet.
Frequently asked questions
How does solar power reach the car chargers?
Solar power passes through the MPPT and PCS to the site’s AC distribution. The charging cabinet draws from that supply and delivers DC to the car dispensers. The battery can store excess solar energy or help meet demand when PV output drops.
Can cars, e-trikes and e-bikes charge at the same time?
The station is designed to serve all three groups. Available power per session depends on the site limit, the number of vehicles plugged in and each vehicle’s charging capability. The EMS would manage available power across the charging areas.
How much evening charging can the battery support?
The proposal models about 1.60 MWh of demand during hours with little or no solar. The energy available to vehicles depends on battery charge at dusk, the reserve setting, conversion losses and other station loads. Use actual evening sessions and site weather data to check coverage.
What is included in the equipment budget?
The US$580,000–680,000 planning range includes the PV modules, MPPT, containerized battery, PCS and EMS. Request separate prices for chargers, dispensers and terminals, site works, freight and on-site commissioning.