PROJECT DESIGN · RWANDA
Rwanda Solar EV Charging: A Kigali Carport Design
A commercial carpark with different charging visits
Staff may park at a commercial property for several hours. Visitors often have less time. Adding EV charging means planning for both, while keeping the carpark easy to enter, use and leave throughout the day.
This Rwanda solar EV charging proposal follows that everyday use at a commercial property in Kigali. The commercial solar carport design combines 71kWp of solar, 261kWh of battery storage and two 120kW dual-connector DC chargers.
Longer stays give the owner more flexibility to schedule charging. For shorter stops, the starting point is how much energy a vehicle needs before departure. Establishing those needs early helps the design team choose equipment positions and a charging plan that fit the visits.
Plan the carport around parking and access
The proposed array contains 100 solar panels rated at 710Wp each, giving 71kWp of installed solar capacity. The canopy layout needs room for those modules alongside the parking and access requirements.
The proposed EV chargers stand beside the charging bays, with a pedestrian route continuing toward the building. Keeping cable reach within the charging area helps separate plugged-in vehicles from people walking to the entrance. Columns and vehicle turning space also shape that arrangement.
Carport supports, drainage and cable routes need to suit the measured site and the way people use the property. A photograph and dimensioned plan help the design team develop the canopy and foundations around the parking area. Our commercial charging installation guide covers the wider installation scope.
Give storage a service area of its own
In this layout, the outdoor battery cabinet occupies a separate service area beside the parking zone. Staff can reach it for inspection without working in a vehicle bay or blocking the main entrance.
The proposed storage system combines 261kWh of battery energy with a 125kW rated PCS. Stored energy can support the agreed charging plan. The cabinet's position needs practical cable routes to the site's electrical equipment as well as access for maintenance.
Before setting that position, the installer reviews equipment access, the supporting surface, clearances and installation conditions. Keep the equipment space accessible in daily use. Leave room to inspect the cabinet and work on its connections.
Set charging priorities before promising power
Two 120kW rated chargers give the proposed site two charging locations. The power each connected vehicle receives depends on the supply available at that time and the agreed operating limits.
EV charging load management at this carpark starts with arrival times, departure deadlines and energy needed per vehicle. For a staff vehicle parked for several hours, the owner may spread charging across that period. A visitor's shorter stop may call for a different priority.
The EMS coordinates charging with the available supply. Its settings need to account for grid capacity, changing solar production, battery limits and other loads at the property. The 125kW PCS rating and 261kWh battery energy are separate sizing inputs.
Vehicle selection matters too. The base charger option uses GB connectors. Confirm the target vehicles, charging inlets and electrical requirements before agreeing the supplied connector version.
What the equipment package and budget cover
The proposed supply package covers five equipment groups:
| Equipment | Proposed configuration | Role at the carpark |
|---|---|---|
| Solar PV modules | 100 × 710Wp; 71kWp total | Solar generation above the parking area |
| Integrated battery storage | 1 × 261kWh system with 125kW rated PCS | Storage and power conversion for the agreed operating plan |
| DC charging equipment | 2 × 120kW rated dual-connector chargers; GB base option | Vehicle charging at two locations |
| Energy management and monitoring | EMS controller and agreed monitoring scope | Coordination of supply and charging priorities |
| Carport support structure | BIPV support package matched to the module layout | Canopy support, coordinated with the site design |
Allow an indicative equipment budget of US$70,000–85,000, FOB Shenzhen. The selected equipment version, vehicle connectors, carport structure and agreed supply scope determine the final quotation.
Freight, import charges, foundations, local construction and installation are quoted separately. External distribution, protection and grid-connection work also need an agreed scope. Tell the supplier if you need payment services, network access or other operating software. Compare the agreed scope and ongoing fees across offers.
Bring your parking and vehicle brief to KUNETIC
Send a dimensioned site plan and photographs showing the entrance, parking area, building access and proposed equipment space. Add the vehicle models, connector details, arrival and departure times, and energy needed for each visit.
Include the existing electrical supply, other site loads and any charging you want available during a grid interruption. KUNETIC and the local installer can use these details to discuss suitable equipment and charging priorities. They can then define the work needed at the property.
Questions about the Kigali carport design
Can both 120kW chargers run at full power together?
That depends on the available site supply, vehicle demand, battery limits and operating settings. The two ratings describe the charging equipment. Review simultaneous demand and the required charging windows before agreeing how much power each connected vehicle can receive.
Can vehicles charge after sunset or during a grid interruption?
After sunset, the operating plan can use available stored energy and grid supply. Charging during an interruption needs a separate review of the loads to support, switching, protection and available energy. The required charging period belongs in the project brief.
Which connector version should be specified for the site?
Match the supplied connectors to the vehicles that will use the carpark. This design starts with a GB-interface option. Share vehicle models and inlet photographs so the appropriate connector version and electrical fit can be confirmed before ordering.
Does the equipment budget include local construction and installation?
The range covers the proposed equipment supply on a FOB Shenzhen basis. Local civil work, installation, connection work, freight and import charges are separate. Ask for itemised supply and installation scopes so the full project budget can be assessed together.