Factory Solar Battery Storage Retrofit: A 931.6 kWh Design

This factory retrofit design adds four liquid-cooled battery cabinets with 931.6 kWh of nominal storage. A separate power conversion system (PCS), rated at 500 kW, would connect them to the factory’s electrical system. The existing rooftop solar could stay in place if the site review confirms a suitable connection. The aim is to save surplus solar energy for the later shift.

01

Solar on the roof, work beyond daylight

In the factory scenario behind this design, the packaging line keeps running as the sun drops. Earlier in the day, rooftop solar can serve the line and other equipment. When the roof generates more than the site uses, the batteries can store some of the difference for the later shift.

A busy production day may leave little surplus to store. A quieter day may leave more, but the evening shift might be shorter. Put the solar output and demand records side by side for the same time intervals. That shows when the batteries could charge and how much demand they could meet later.

02

Adding storage to the factory’s 400 V AC system

In this AC-coupled battery storage design, the existing PV inverter feeds the factory’s 400 V AC bus. The new storage system connects to that bus through its own PCS. During charging, the PCS converts AC power for the batteries. During discharge, it converts battery power back to AC for the factory. The roof array stays on its existing inverter branch.

Connection concept showing the factory AC bus and proposed PCS and battery branch

Start at the switchboard with the factory’s single-line diagram. The electrical team can use it to find a connection point and check switchboard capacity, protection and grid requirements. They also need to see where the meters sit. The energy management system (EMS) uses those readings to work out when solar generation exceeds site demand. See KUNETIC’s commercial solar battery storage guide for more on planning a retrofit.

03

Where the four battery cabinets would go

This commercial battery storage design places four battery cabinets and a separate PCS in an outdoor service area. On the site walk, trace the cable route to the switchboard. Check where a truck can unload and how maintenance staff can reach the cabinets during a shift.

A spot close to the switchboard could shorten the cable run. Walk the yard during a delivery as well as between trucks. A clear patch of concrete still needs to leave room for cabinet doors, service work and normal traffic. The team can confirm the foundations and access clearances once they’ve checked the yard and the equipment requirements.

Design illustration of four battery cabinets and a separate PCS on the factory’s outdoor equipment pad
04

How much energy could carry into the later shift?

Each cabinet stores 232.9 kWh of nominal energy, for a total of 931.6 kWh. The PCS contains four 125 kW modules, giving it a rated power of 500 kW. For a shift supervisor, there are two things to check. How much energy will be available when the shift starts? And how much power can the system deliver when several machines are running? Battery discharge limits and operating conditions can reduce the power available at the switchboard.

Design illustration of packaging staff working during a later shift

When there’s solar surplus, the EMS would direct it to the batteries within their charge limits. Later, the EMS could time discharge to match the factory’s demand and stop at the agreed reserve. The grid would cover the balance. On a day with little surplus, the factory would have less solar energy in storage for the shift.

Start with the expected battery charge at shift change. Allow for the reserve and conversion losses to estimate the energy available at the AC connection. Then compare that energy with the load across the shift.

Daylight solar use, surplus charging and later battery discharge above reserve
05

What the proposed supply includes

Proposed equipment supply
Proposed supplyQuantityRole on this site
Liquid-cooled DC battery cabinets4232.9 kWh each, 931.6 kWh nominal in total
Separate PCS cabinet1Four 125 kW modules, 500 kW rated in total, with a 400 V AC interface
DC connection cables1 lotConnections between the battery cabinets and the PCS, with lengths and terminations confirmed in the supply schedule
Energy management system1 setLocal controller and cloud platform for monitoring and coordinating storage operation
Control system engineering1 lotDevelopment work for the agreed control functions

The design uses the factory’s existing PV array, inverter and distribution equipment. The site review determines whether any switchboard or connection upgrades are needed.

06

Equipment budget and site work

Allow US$134,000–164,000 as a tax-inclusive planning range for the listed storage equipment, EMS and control system engineering. Budget separately for freight, installation and AC cabling from the PCS to the factory switchboard. Any work on the existing PV or distribution system should also be scoped separately.

The cable route, switchboard interface and control requirements help turn that planning range into a project quotation. For export projects, the quotation will also specify delivery terms and the applicable tax basis.

07

Planning a retrofit for your factory

If you’re planning a similar retrofit, send the PV capacity, inverter details and single-line diagram you have on hand. Share demand and generation readings for a typical workweek if available, along with the usual shift times. If the plant runs a different schedule on weekends, include that too.

Photos of the switchboard and the proposed equipment area help the team assess how the new branch and cabinets would fit. If the factory also needs power during an outage, list the equipment that must stay on and the required supply duration so that backup can be evaluated alongside the retrofit.

Send your factory’s PV and load information for a storage retrofit proposal.

08

Frequently asked questions

Can the factory keep its existing solar inverter?

Yes, if the existing inverter and electrical system are compatible with the retrofit. In this design the inverter stays on its AC branch. The site team checks the connection point, metering, export settings and protection before finalizing how the storage system connects.

Can this design power the factory during a grid outage?

This design covers operation with the grid available. If backup is required, the project team needs to check whether the PCS and controls can establish an islanded supply, how the site would isolate from the grid, and which loads and starting currents that supply would need to handle.

How much of the 931.6 kWh can be used for a later shift?

It depends on the energy stored when the shift begins, the reserve the operator keeps and the losses between the batteries and the factory’s AC supply. To estimate the number of hours, use the expected load through the shift and check it against the system’s available discharge power.

Does the equipment budget include installation and new solar panels?

The range covers the five items in the supply table. Freight, site installation and the AC cable run to the switchboard are separate. The design reuses the factory’s existing solar panels and inverter, subject to the compatibility review.

PROJECT ENQUIRY

Plan Your Factory Retrofit

Share your existing solar equipment, shift times and site load data.

Visit our contact page

Discuss Your Factory Retrofit

Tell us how your factory uses power today.

Minimum 10 characters.

Drag & Drop a Project File Here

PDF, JPG, PNG, WEBP, DOCX, XLSX or ZIP · Max 8 MB