PROJECT DESIGN · TRINIDAD AND TOBAGO
Trinidad and Tobago EV Charging Pilot: Planning Around a Limited Grid Connection
Start with the pilot site
Picture two drivers arriving at the same time. One needs a quick top-up. The other will be parked for a while. At this proposed charging site in Trinidad and Tobago, where they stop matters as much as how much power they can draw.
The Trinidad and Tobago EV charging pilot brief lists three 120 kW DC fast chargers and two AC chargers. The customer reports a grid connection below 350 kVA. Those figures shape both the first site walk and the equipment order. The pilot would give the operator a chance to see how drivers actually use the bays before pricing a larger station.
Give short and long stays their own charging spaces
From the entrance, drivers making a short stop should be able to spot the DC bays and see where to wait if they’re full. Drivers staying longer can head to the AC bays. Where the site allows, the waiting area should sit clear of the entry lane and the routes vehicles use to leave a bay.
Walk the layout with the proposed charger locations in mind. Can a driver reach a vehicle inlet without crossing the next bay? Can an installer reach the equipment without closing the entry lane? The answers help the operator confirm bay layout, terminal count and cable reach with the site designer.
Set the site power limit before choosing the chargers
The three proposed DC units have a combined rated output of 360 kW. A connection below 350 kVA cannot supply that full output at once, even before conversion losses, AC charging and other site loads are counted. Have the local electrical designer check the service capacity and set the import limit at the main supply point.
EV charging load management starts with what the site draws at that point. The operator and installer can agree how the site controller will allocate the remaining capacity when DC and AC sessions overlap. Depending on the equipment, the controller may limit individual chargers or request a total power cap from a shared power unit.
Before equipment is ordered, ask the supplier to show how the proposed controls communicate with each charger. Agree what the system should do if a meter reading or communications link is lost, and include that behavior in acceptance testing. Our commercial EV charging installation guide covers the wider site preparation.
Use the pilot data to decide when to expand
Once a pilot is operating, record arrival times, dwell time, energy delivered per session and how often more than one vehicle charges at once. Match those records to peak import and the periods when chargers reduce output. If drivers wait while chargers still have power available, look at the number of bays and how long vehicles stay. If several active chargers keep slowing down, check whether the site is hitting its import limit.
Those records can help the operator decide whether to revisit bay allocation, adjust the charger mix or request more grid capacity. Use those figures to compare the larger station against the number of drivers you want to serve at the busiest hour.
Bring your site details to a configuration review
Bring a recent service or transformer schedule, a site sketch and a list of other loads sharing the connection. Include the charger types you are considering, the time drivers usually stay and the number you expect to serve together at busy periods.
KUNETIC can use those inputs to discuss the equipment scope, controls and options with your local design team. Discuss your charging site with KUNETIC.
Frequently asked questions
Can all three 120 kW DC chargers run at full output together?
The combined DC output would be 360 kW, above the theoretical real power available from the reported connection. Plan the simultaneous output around the verified supply and the other loads the site must serve.
How is charging power shared at a busy site?
The site controller can use the agreed input limit and measured site load to set the charging allowance. The selected hardware and controls determine how that allowance is shared among active sessions.
Does the pilot include solar or a canopy?
The pilot brief calls for a grid-connected charger package with open bays. Plain and solar canopies are separate options for the ten-position reference station.
What should the operator measure before considering more chargers?
Record concurrent sessions, vehicle dwell time, energy per visit, peak import and periods of reduced output. Use these records to identify whether the bottleneck is space, charging power or the grid connection.